Construction Contract Checklist: 15 Clauses to Include Before Hiring a Contractor

Guides ยท October 9, 2026

Completed house in Lahore with Planet Builders project signboard at the entrance

Quick answer: A good house construction contract in Pakistan should clearly define the scope, drawings, specifications and BOQ, the price and payment milestones, how material price changes and variations are handled, the schedule and delay penalties, quality checks, a defects liability period with retention, and a dispute resolution process. Vague contracts are the main cause of cost overruns and disputes between homeowners and builders.

The 15-Point Contract Checklist

1. Parties and project details

Full names, CNIC or company registration, addresses, plot number and society or authority.

2. Drawings and documents

List every drawing by number and revision: architectural, structural, electrical and plumbing. State which document prevails if there is a conflict; structural drawings should govern structural work.

3. Scope of work

State exactly what is included and excluded: grey structure only, finishing, elevation, boundary wall, tanks, approvals, utility connections, landscaping. Our grey structure inclusions checklist helps define this.

4. Material specifications

Name brands or approved equivalents, grades and sources: cement brand, steel grade, brick class, sand and crush source, concrete and mortar ratios, pipe brands. See our A, A+ and A++ specification guide.

5. Bill of quantities (BOQ)

An itemized BOQ with quantities, units and rates makes variations and payments transparent.

6. Contract price and type

Fixed lump sum, per sq ft, or BOQ-based re-measurement. State whether the price includes labour only or labour and materials. Compare options in labour rate vs with-material contracts.

7. Payment schedule

Tie payments to completed, inspected stages such as foundation, plinth, each slab and plaster, not to calendar dates. Keep the advance reasonable.

8. Price escalation

Agree whether prices are fixed or adjustable for major materials like steel and cement, and how changes are calculated and documented.

9. Variations and change orders

All changes must be agreed in writing with price and time impact before the work is done.

10. Schedule and delays

Start date, milestone dates, completion date, and what happens if either party causes delay. Allow fair extensions for weather or authority delays.

11. Quality control and inspections

Owner's or engineer's right to inspect before concealment, at steel fixing, slab casting, plumbing and electrical stages. Include testing such as concrete cubes and pressure tests. Use our quality checklist.

12. Site safety and insurance

Contractor's responsibility for worker safety, safe scaffolding, protection of neighbours and any damage caused.

13. Defects liability and retention

A defects period after handover (for example 6 to 12 months), with a retention amount (for example 5 percent) held until defects are fixed. Include warranties for waterproofing and termite treatment.

14. Termination

Conditions under which either party can end the contract, and how completed work and materials will be valued.

15. Dispute resolution

Steps for resolving disputes: negotiation, then mediation or arbitration, before court.

Red Flags When Hiring a Contractor

  • Refusal to give a written contract or BOQ
  • Very low per sq ft rate with vague specifications
  • Demand for a large advance before work starts
  • No completed projects you can visit
  • Payments requested by date rather than progress

See our guide on choosing the right construction company in Lahore, and our advice for overseas Pakistanis hiring a builder.

Documents to Keep During Construction

  • Signed contract, drawings and BOQ
  • Payment receipts and invoices
  • Written change orders
  • Inspection records, photos and test results
  • Material delivery records and warranties

Planet Builders provides written contracts with itemized BOQs and stage-linked payments for every grey structure and turnkey project.

This checklist is general guidance, not legal advice. For large or complex projects, have the contract reviewed by a lawyer.

Frequently Asked Questions

What should a construction contract include in Pakistan?

Scope, drawings, specifications, BOQ, price, payment milestones, escalation, variations, schedule, quality checks, defects liability, termination and dispute resolution.

How much advance should I pay a contractor?

Keep the advance modest and link further payments to completed, inspected stages. The exact amount should be agreed in the contract.

What is a retention amount?

A percentage of payment, often around 5 percent, held back until the defects liability period ends and defects are fixed.

Should the contract be on stamp paper?

Many owners execute contracts on stamp paper and have them witnessed. A lawyer can advise on stamp duty and registration requirements.